Service
Power transformer maintenance
Field diagnostics and maintenance from 75 kVA to 230 MVA. Major workshop intervention depends on mass, dimensions, lifting, transport and available process.

Maintaining a power transformer means preserving four systems that age at different rates: the dielectric integrity of the insulating oil, the condition of the solid insulation (paper and barriers), the mechanical health of windings and core, and the operation of accessories — bushings, radiators, tap changer, Buchholz relay and protective devices.
A correct program is not a generic checklist: it is designed from the equipment's rating, age, load regime and the results of previous tests. The difference between maintenance that extends service life and maintenance that just ticks a box is the diagnosis that precedes it.
At TEVKO we document every intervention with real electrical values — insulation power factor, insulation resistance, turns ratio, winding resistance — and oil parameters, so the client has traceability of the asset's condition between one service and the next.
Maintenance modes we perform
External preventive maintenance
Inspection and cleaning of bushings and connectors, radiators, fans and pumps, control cabinet, protective devices, level and temperature indicators, Buchholz relay and silica gel replacement.
When it applies: Asset in normal operation; engineering must justify the schedule against the manufacturer's instructions, condition and history.
Major maintenance
Internal intervention, winding clamping re-torque, tap-changer service and full oil processing.
When it applies: Only when a documented diagnosis and the manufacturer’s procedure justify it; no universal interval.
How we execute the service
Context
We understand the asset, its history and the real problem before proposing anything.
Diagnosis
We measure condition with Omicron and Megger instrumentation and compare against standards.
Intervention
We execute the solution the diagnosis justifies, with safe maneuvering and coordinated outage.
Result
We verify with tests and deliver a documented protocol with recommendations.
Video · Spanish audio
The maintenance window is booked: what do you address first?
Having a maintenance date does not define the scope. Electrical tests identify findings and rank them, so the outage window is spent on what the condition of the equipment points to rather than on a generic checklist.
Full transcript and technical contextVideo
Why a transformer hums: magnetostriction
A transformer hums with no moving parts: the steel core vibrates 120 times a second at 60 Hz. What to check if it suddenly gets louder.
Full transcript and technical contextVideo
Transformer hot-spot temperature and aging
The gauge reads top oil, not the winding hot spot. Above 110 °C, every ~7 °C doubles paper aging, per IEEE C57.91. Paper does not regenerate.
Full transcript and technical contextVideo · Spanish audio
Mantenimiento a transformador: los 9 pasos en orden
El mantenimiento a un transformador son nueve pasos y siempre en el mismo orden: se programa el paro, se desenergiza y se aterriza, se toma la muestra de aceite para análisis de gases disueltos, y siguen resistencia de aislamiento, factor de potencia, relación de transformación, resistencia de devanados, boquillas y empaques, y filtrado y desgasificado del aceite. El paso más importante es el aceite: los gases avisan de una falla interna antes de que ocurra.
Full transcript and technical contextFrequently asked questions — power transformer maintenance
How often should a power transformer be maintained?
The schedule must be documented against the manufacturer's instructions, asset condition and trends, load, environment, history and failure consequences. Engineering must justify the program and reassess it when anomalies appear; this page does not prescribe a universal interval.
What is the difference between preventive, corrective and major maintenance?
Preventive is done on a healthy unit to avoid failure; corrective addresses a detected anomaly; major involves deep internal intervention. Which one applies comes from the diagnosis, not age alone.
Does the transformer need to be taken out of service?
It depends on scope. Thermography is done energized; oil sampling is often done in service when the sampling valve can be reached within safe approach distances, and otherwise it is scheduled in the outage. Full electrical tests require the transformer de-energized and a coordinated outage. We plan the outage to minimize downtime.
What instrumentation do you use?
High-precision Omicron and Megger instrumentation, plus a thermal camera. This lets us compare results against manufacturer reference values and the equipment's own history.
Power transformer maintenance in images