TEVKO, transformadores y subestaciones de potencia
Harnessed technician operating the power factor test set on a platform, beside the case and the laptop

Electrical test

Insulation power factor and Tan Delta

Measurement of dielectric losses in transformer and bushing insulation to detect moisture, contamination and paper-oil ageing before they cause failure.

Harnessed technician operating the power factor test set on a platform, beside the case and the laptop
What the photo showsHarnessed technician operating the power factor test set on a platform, beside the case and the laptop.

A perfect insulation would behave like an ideal capacitor. In reality, paper and oil have losses that appear as a resistive current in phase with the voltage. Power factor (or Tan Delta) quantifies that leakage: the higher the value, the worse the dielectric condition.

Share the nameplate data and the reason for the test; we reply with the proposed scope.

The test is performed at elevated voltage (typically 10 kV) between windings and to ground, measuring capacitance and losses. The result is corrected to 20 °C, and since correction factors are approximate, it is best to test at comparable temperatures between campaigns. Guides such as IEEE C57.152 give reference ranges, but there is no single threshold for every transformer: the criterion comes from comparing against the factory report, previous tests on the same unit and similar units. An increasing trend over time is the most reliable alarm.

On bushings, Tan Delta and capacitance detect deterioration of the capacitive insulation before an explosion — one of the most frequent and violent causes of transformer failure. At TEVKO we measure with Omicron and Megger instrumentation, correcting for temperature and comparing against the bushing nameplate values, when the manufacturer provides them, and against history.

What we evaluate

Winding-to-winding and to-ground insulation

Tan Delta and capacitance in CH, CL, CHL configurations to locate where the dielectric degradation is.

When it applies: Diagnosis of moisture or paper-oil ageing.

Bushing insulation (C1 and C2)

Power factor and capacitance of capacitive bushings to anticipate catastrophic failure.

When it applies: Transformers with condenser-type bushings.

How we run the test

Preparation

Transformer de-energized, isolated and with temperature recorded for 20 °C correction.

Measurement

Tan Delta and capacitance at 10 kV in each winding configuration and on bushings.

Correction

Results normalized by temperature and compared against standards and history.

Diagnosis

Verdict on moisture/contamination and recommendation (drying, filtering, monitoring).

Video

Bushing creepage distance and pollution

Bushing sheds lengthen the creepage path. Near the sea, IEC 60815 calls for up to 53.7 mm/kV. Salt or dust plus dew shortens that path.

Full transcript and technical context

Frequently asked questions — insulation power factor and tan delta

What does a high insulation power factor indicate?

Higher dielectric losses, generally from moisture, contamination or ageing of the paper-oil system. There is no single value that separates acceptable from unacceptable for every unit: the temperature-corrected result is compared against the factory report, previous tests and similar units, with ranges from guides such as IEEE C57.152 as reference. An increasing trend between tests is the most reliable alarm.

What is the difference between power factor and Tan Delta?

For small angles they are practically equivalent: power factor is the cosine of the angle between current and voltage, and Tan Delta is the tangent of the complementary angle. In healthy insulation both values are very low and nearly identical.

Why is it important to test bushings?

Deterioration of a bushing's capacitive insulation is one of the most violent causes of transformer failure. The bushing's Tan Delta and capacitance detect that deterioration early, preventing the explosion and associated fire.

How often is this test recommended?

The schedule must be documented against the manufacturer's instructions, asset condition and trends, load, environment, history and failure consequences. Engineering must justify the program and reassess it when anomalies appear; this page does not prescribe a universal interval.

Insulation power factor and Tan Delta in images

Power factor test set open on its transport case, with the leads run out across the substation floor
Power factor test set open on its transport case, with the leads run out across the substation floor
Laptop, instruments and test cases beside a transformer.
Laptop, instruments and test cases beside a transformer.
Technician in orange coveralls connecting the test lead at the top of a bushing, in a substation yard
Technician in orange coveralls connecting the test lead at the top of a bushing, in a substation yard

Related tests and services

Talk to a transformer specialist

Tell us about your asset so we can define the assessment scope and prepare a tailored quote.

Get a quoteEmailEmergency