Diagnostic electrical testing of transformers and substations with a documented protocol.

Field crew of four around two Megger test sets and a laptop, in a substation yard
What the photo showsField crew of four around two Megger test sets and a laptop, in a substation yard.

Diagnosis is the foundation of every sound maintenance decision. Without real electrical data, any intervention is guesswork. We measure the condition of the insulation, windings, core and accessories, and compare against standards and asset history.

Share the nameplate data and the condition you observe; we reply with the proposed scope.

Our protocol combines tests that each isolate a different failure mode: insulation resistance and turns ratio as a base, power factor/Tan Delta for dielectric condition, DGA for in-service monitoring, and SFRA when mechanical damage is suspected.

The value is in interpretation: reading the results together and against the equipment's own history is what turns a set of measurements into a diagnosis and a clear recommendation.

What we diagnose

Transformer test protocol

TTR, power factor, insulation resistance, winding resistance, DGA and SFRA.

When it applies: Periodic diagnosis or acceptance after repair.

Substation testing

Breakers, instrument transformers, contact resistance and protection.

When it applies: Substation maintenance and commissioning.

How we execute the service

Planning

Outage coordination and test plan by asset criticality.

Testing

Test execution, temperature-corrected where applicable.

Interpretation

Results read together and against history and standards.

Protocol

Documented report with verdict and recommendations.

Documented international experience

Dry-type transformer diagnostics in Jamaica

See TEVKO’s fieldwork: visual inspection, insulation resistance and insulation power factor testing. Three photographs document the on-site assignment. Measurement values and an acceptance decision are not published in this case.

Video · Spanish audio

Repair or replace a transformer? Measured condition is what decides

Whether to rehabilitate or replace a transformer is not settled by the unit's age but by what the electrical tests measure and by the condition of the insulating paper. With that diagnosis, maintenance can justify the route to operations and procurement.

Full transcript and technical context

Video

Why a transformer hums: magnetostriction

A transformer hums with no moving parts: the steel core vibrates 120 times a second at 60 Hz. What to check if it suddenly gets louder.

Full transcript and technical context

Video

Acetylene in transformer oil (DGA)

Acetylene in the oil is the signature of an arc. Per IEEE C57.104-2019, it forms in meaningful amounts only near 1000 °C. One sample is not enough.

Full transcript and technical context

Frequently asked questions — diagnostics & electrical testing

What tests are essential for a power transformer?

As a base: insulation resistance, turns ratio (TTR), power factor/Tan Delta and dissolved gas analysis (DGA), complemented by SFRA when mechanical damage is suspected and thermography in service.

Which tests require an outage?

TTR, power factor, insulation resistance and SFRA require the equipment de-energized. Thermography is done in service; oil sampling for DGA is often done in service when the sampling valve can be reached within safe approach distances, and otherwise it is taken during the outage.

Why compare against history?

Most of these tests are more useful as a trend than as an isolated value; comparing against previous measurements reveals degradation a single reading does not show.

What do I receive at the end?

A protocol with measured values, condition verdict, findings and recommendations for the next cycle — technical evidence to support operation and budget decisions.

Diagnostics & electrical testing in images

Technician crouching to operate two interconnected test sets, with the leads running out to the unit
Technician crouching to operate two interconnected test sets, with the leads running out to the unit
Technician in orange coveralls connecting the test lead at the top of a bushing, in a substation yard
Technician in orange coveralls connecting the test lead at the top of a bushing, in a substation yard
Field crew with two Megger test sets connected, transport cases and a laptop, during electrical testing at a substation
Field crew with two Megger test sets connected, transport cases and a laptop, during electrical testing at a substation
Two technicians at a laptop and instrument cases during a testing campaign
Two technicians at a laptop and instrument cases during a testing campaign

Related tests and services

Talk to a transformer specialist

Tell us about your asset so we can define the assessment scope and prepare a tailored quote.

Get a quoteEmailEmergency