The first step is scheduling the outage with TEVKO. Then the transformer is de-energized and grounded before any connection is touched.

The most important step starts with a bottle of oil: dissolved gas analysis. Gases formed inside the tank warn of an internal fault before the transformer fails.

Then come the electrical tests: insulation resistance, power factor, turns ratio at each tap position and winding resistance. Bushings, gaskets and torque are checked, and the oil is filtered and degassed before re-energizing.

This piece is animation and typography: it does not show TEVKO personnel. The figures are the ones in the script and can be checked against this page and the linked pages.

Transcript — English audio

What is done to a transformer during maintenance?

9 steps, always in the same order.

And the most important one starts with a bottle of oil.

1.

You call TEVKO and we schedule the outage with you.

2.

It is de-energized and grounded.

3.

The most important: an oil sample for dissolved gas analysis.

The gases warn of an internal fault before the transformer fails.

4.

Insulation resistance.

5.

Insulation power factor.

6.

Turns ratio at every tap changer position.

7.

Winding resistance.

8.

Bushings, gaskets, tightening and cleaning.

9.

Oil filtering and degassing, and it is energized again.

It's not the tank, it's the oil.

Comment TRANSFORMER and we'll tell you what to check on yours.

The same captions ship as a WebVTT track inside the player. The video closes with an invitation to comment and the contact details: ventas@tevko.com and +52 33 2101 7241.

Questions this video answers

What is the most important step in transformer maintenance?

The oil sample for dissolved gas analysis: the gases warn of an internal fault before the transformer fails.

Which electrical tests are done?

Insulation resistance, power factor, turns ratio at each tap position and winding resistance.

What is done to the oil?

A sample is taken for analysis and, at the end, the oil is filtered and degassed before re-energizing.

Does TEVKO maintain transformers?

Yes, with a scheduled outage and a report for each test. Contact ventas@tevko.com or +52 33 2101 7241.

Related pages

Technical content reviewed by TEVKO Technical Management · last reviewed: November 16, 2026

Request a technical assessment

Write to our sales inbox with the following and we will tell you what the next step is:

  • The nameplate: rating, voltage, make and serial number.
  • The location of the installation.
  • The problem the unit presents, or the event that occurred.
ventas@tevko.com