Substation maintenance: the 9 steps in order

Duration
62 seconds
Language
Spoken in English
Captions
English captions, switchable from the player
Published
Published November 16, 2026

What is behind this video

The first step is scheduling the maintenance with TEVKO. The second, and the most important, is done before shutting down: thermography with the substation energized and under load finds the hot connections.

With the hot spot list, the outage and lockout are done and temporary grounding is installed. Then insulators and bus are cleaned and connections are torqued.

Next come tests on breakers and switches, the transformer and protections. Finally the grounds are removed and the substation is re-energized. It is not tightening everything: it is knowing what was hot.

This piece is animation and typography: it does not show TEVKO personnel. The figures are the ones in the script and can be checked against this page and the linked pages.

Transcript — English audio

What is done to a substation during maintenance?

In 9 steps, always in the same order.

And the most important one is done before shutting it down.

1.

You call TEVKO and we schedule the maintenance with you.

2.

The most important: thermography with the substation energized and under load, to find the hot connections.

3.

Lockout and tagout.

4.

Temporary grounding.

5.

Cleaning of insulators and bus bars.

6.

Connections torqued to spec.

7.

Testing of breakers and disconnect switches.

8.

Testing of the transformer and protections.

9.

The grounds are removed and it is energized again.

It's not tightening everything, it's knowing what was hot.

Comment SUBSTATION and we'll tell you what to check on yours.

The same captions ship as a WebVTT track inside the player. The video closes with an invitation to comment and the contact details: ventas@tevko.com and +52 33 2101 7241.

Questions this video answers

What is the most important step in substation maintenance?

Thermography with the substation energized and under load, before shutting it down, to know which connections are hot.

Why isn't tightening every connection enough?

Because thermography shows which ones were hot; those are the ones checked and corrected.

Which tests are done during the outage?

Tests on breakers and switches, the transformer and the protections.

Does TEVKO maintain substations?

Yes, with prior thermography and a report. Contact ventas@tevko.com or +52 33 2101 7241.

Related pages

Technical content reviewed by TEVKO Technical Management · last reviewed: November 16, 2026

Request a technical assessment

Write to our sales inbox with the following and we will tell you what the next step is:

  • The nameplate: rating, voltage, make and serial number.
  • The location of the installation.
  • The problem the unit presents, or the event that occurred.
ventas@tevko.com